PT Vale Indonesia Tbk. is a nickel producer operating integrated mining and nickel matte processing facilities in Sulawesi, Indonesia.
Following the issuance of its IUPK as a continuation of the previous contract of work, the company has undertaken a revision based on the techno-economic feasibility study for the Soroako Project.
This revision primarily reflects updates to the production plan to align with the IUPK validity period and associated commitments, including planned investments in the development of new nickel ore processing facilities.
Key Topics:
- Integrated field and laboratory program, including site reconnaissance, coring, sampling, SPT, DCP, and laboratory testing.
- Systematic data analysis to define soil stratigraphy, strength parameters, and subgrade bearing capacity.
- Results supported ground suitability assessment, identified geotechnical constraints, and informed infrastructure design and stability.